Originally
set up to maintain the street and lateral
canal drainage systems, this division has
taken on some major drainage projects in
recent years.
The hazard mitigation program funded
under the Louisiana Office of Emergency
Preparedness and FEMA has provided, through
grant awards, funds for major drainage
improvements throughout the Parish. Some of these projects included drainage culvert replacement
and/or enhancement and canal cleaning and
grubbing as well as maintenance dredging.
The completion of the South Vacherie
Backwater Control Structure in 2001, at a
cost of $1.3 million, represented the
largest drainage construction project in
Parish history.
With a recent tax renewal, the Parish
is now focusing on several major drainage
projects, which include the re-dredging of
40 miles of the major drainage canals.
This division supports a workforce of
8 equipment operators and utilizes 2 large
excavators, a marsh buggy dragline, a
gradall, and 2 culvert cleaners to maintain
existing drainage canals and ditches.
|